Please contact us for more details.
Instruction of this machine line
The machine production line includes: Manual uncoiler, Roll forming machine, computer control system, hydraulic control system, cutting system, discharge table
Our products are widely used in various industrial factory, civilian building, warehouse and easy steel building manufacturing, and have features such as nice appearance and durable.
—- It is very easy to install the equipment and suitable for producing in the factory.
—- Low noise with high efficiency.
2. The roll forming machine parameters
1. | Power
requirement
|
Type | 380v/3ph/50hz |
Main Motor power | 3kw | ||
Cutter power | 5.5kw with 2.2 kw servo motor | ||
2. | Forming speed(m/min) | 40-45m/min max | Not include the time of cutting |
3. | Forming stations | 12stations | |
5. | Material of rollers | CR12 | |
6. | Thickness of structure | 30mm | |
7 | Forming shaft diameter(mm) | 40 | |
8 | Drive | Gear box | |
9 | Type of cutting | Hydraulic cutting | |
10. | Control system | PLC xinjie | |
11. | Install dimension(depend on the final design) | 4.8m×0.6m×1.2m | Without panel length |
12. | Total weight (Approx) | 2.3T | Depend on final design |
13. | Screen | Text screen /touch screen |
Machine Components | ||
No. | Name | QTY |
1 | Manual uncoiler | 1 set |
2 | Feeding and leveling device | 1 set |
3 | Roll forming system | 1 set |
4 | Hydraulic punching and cutting | 1 set |
5 | Product support frame | 1 set |
6 | PLC Control System | 1 set |
1. Low cost, light weight but high strength, short building period, and re-cycle use
2. Save material , no waste.
3. Easy operation, low maintenance cost
4. Infinite sizing(any size within machine range),help to save material
5. Optional Punch hole at any position of purlin web side and flange side
Some relative terms we can provide:
1. Minimum order quantity (MOQ): 1 piece
2. Delivery time: about 45 workdays
3. Port of loading: port of Xiamen
4. Type of payment: by T/T or by L/C
5. Export: Australia, UK, Ireland, Mexico, Brazil ,Israel ,Dubai, Russia ,India, Taiwan, Singapore,
Malaysia ,Thailand, Philippines, Myanmar ,Vietnam, South Africa, Mozambique,
Zambia, Zimbabwe, Nigeria, Egypt, Sudan, etc.
Packing Method
Main machine is packaged with plastic film
Transportation
All machines need one 20 feet container to hold
Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment.
Delivery Time
Within 35 days after receiving deposit.
Warranty: Two years, and we will provide technical support for wholelife of the equipment. If some parts of machine broken within 2 years, we will give customer the spare parts for free. (include chain, bearing, roller, oil pipe, counting wheel) If more than 2 years, maybe some spare parts need to be charged. If machine can not work well, we can teach them online until the machine is perfect. If you need, we can go to your place to assist you. But you need to provide the cost of the engineer.
FAQ
Q1. What’s your payment terms and delivery time?
A1: 30% as the deposit by T/T in advance, 70% as the balance payment by T/T after your inspect the machine well and before delivery. Of course your payment terms are acceptable.
After we get down payment, we will arrange production. About 30-45 days for delivery.
Q2. Do you have after-sales support?
A2: Yes, we are happy to provide advice and we also have skilled technicians available across the world.
Q3. Do you sell only standard machines?
A3: No, most of our machines are built according to customers specifications, using top brand components.
Q4. What will you do if the machine is broken?
A4: We provide 18 months free warranty and free technical support for the whole life of any machine.
If the broken parts can’t repair, we can send the new parts replace the broken parts freely, but you need pay the express cost by yourself. If it is beyond the warranty period, we can negotiate to solve the problem, and we supply the technical support for the whole life of the equipment.
Q5. Can you be responsible for transport?
A5: Yes, please tell me the destination port or address. we have rich experience in transporting.
Q6. How to visit your company?
A6: 1) Fly to Beijing airport, By high speed train From Beijing Nan to Cangzhou Xi (1 hour).
2) Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.
We are one of the best cold roll forming machinery and equipment manufacturers and suppliers in China.