Search
Close this search box.

product

C&Z purlin roll forming machine 70-100-150

Please contact us for more details.

C&Z purlin roll forming machine 70-100-150

Please contact us for more details.

C&Z purlin roll forming machine 70-100-150

Please contact us for more details.

Product Details

Raw material
material spec sheet, galvanized steel sheet, aluminum sheet
thickness of coil sheet 0.5-3mm
Machine details
roller material High grade NO. 45 forged steel with 0.05mm hard chrome plating
shaft material High grade NO. 45 carbon wrought steel
cutting blade Cr12 mould steel with quenched treatment
diameter of shaft 80mm
forming steps 12 rows
productivity 20-25m/min
hydraulic station power 22 KW
hydraulic pressure 10-12MPa
controlling system famous PLC computer control
material of cutting table Cr 12 mould steel with quenched treatment
appearance size 7500mm*1150mm*1510mm
hydraulic oil 40# hydraulic oil
Electric tension 380V 50 Hz 3 Phase or as your requirements

Device Configuration

No number
(1) Manual decoiler 1 set
(2) Guiding device 1 set
(3) Main roll forming machine 1 set
(4) Hydraulic cutting device 1 set
(5) PLC electric control system 1 set
(6) Hydraulic driving system 1 set
(7) Special tools and parts 1 set

Packaging and shipping

FAQ

Q1. What’s your payment terms and delivery time?
A1: 30% as the deposit by T/T in advance, 70% as the balance payment by T/T after your inspect the machine well and before delivery. Of course your payment terms are acceptable.

After we get down payment, we will arrange production. About 30-45 days for delivery.

Q2. Do you have after-sales support?
A2: Yes, we are happy to provide advice and we also have skilled technicians available across the world.

Q3. Do you sell only standard machines?
A3: No, most of our machines are built according to customers specifications, using top brand components.
Q4. What will you do if the machine is broken?
A4: We provide 18 months free warranty and free technical support for the whole life of any machine.
If the broken parts can’t repair, we can send the new parts replace the broken parts freely, but you need pay the express cost by yourself. If it is beyond the warranty period, we can negotiate to solve the problem, and we supply the technical support for the whole life of the equipment.

Q5. Can you be responsible for transport?
A5: Yes, please tell me the destination port or address. we have rich experience in transporting.

Q6. How to visit your company?
A6: 1) Fly to Beijing airport, By high speed train From Beijing Nan to Cangzhou Xi (1 hour).
2) Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.

Related Products

003
C&Z purlin roll forming machine 76-101-152
Please contact us for more details.
正面
C&Z purlin roll forming machine 70-100-150
Please contact us for more details.
3
C&Z purlin roll forming machine
Please contact us for more details.
02
C&Z purlin roll forming machine
Please contact us for more details.

Send us a message