Search
Close this search box.

product

Metal stud and track roll forming machine U25-30

Please contact us for more details.

Metal stud and track roll forming machine U25-30

Please contact us for more details.

Metal stud and track roll forming machine U25-30

Please contact us for more details.

Product Details

1. Brief introduction of the machine
—- We adopted a non stop cutting system to enhance the machine running speed.
—- Hydraulc drive motor provide strength power to make the machine running fast.
—- High precision machining parts ensure machine’s high speed.
—- Good service let you no any trouble.
2. Machine parameters

Material Colored steel sheet, galvanized steel sheet, aluminum sheet
Thickness of coil sheet 1.0-2.0mm
Efficiency width 25/30mm
Machine details
Roller material High grade NO. 45 forged steel with 0.05mm hard chrome plating
Shaft material High grade NO. 45 carbon wrought steel
Cutting blade Cr12 mould steel with quenched treatment
Diameter of shaft 70mm or as your requirement
Main frame 300 H steel
Forming steps 16 stations
Productivity 30-35m/min
Hydraulic station power 5.5 KW
Hydraulic pressure 10-12MPa
Appearance size 7700mm*1500mm*1500mm
Hydraulic oil 40# hydraulic oil
Electric tension 380V 50 Hz 3 Phase or as your requirement
Cut Mode Hydraulic forming after cutting off
Cutter materia Cr12 Heat Treatment
Electronic control system PLC, Touch Screen, Encoding counter
Color Blue, green or yellow or as your requirement
Rolling material 45# steel,roller surfaces polishing, hard plating

 

Machine Components
No. Name QTY
1 Manual uncoiler 1 set
2 Feeding and leveling device 1 set
3 Roll forming system 1 set
4 Hydraulic punching and cutting 1 set
5 Product support frame 1 set
6 PLC Control System 1 set
Our machine advantages

1. Low cost, light weight but high strength, short building period, and re-cycle use

2. Save material , no waste.

3. Easy operation, low maintenance cost

4. Infinite sizing(any size within machine range),help to save material

5. Optional Punch hole at any position of purlin web side and flange side

Packing Method

Main machine is packaged with plastic film

Transportation

All machines need one 20 feet container to hold

Payment Term

30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment.

Delivery Time

Within 35 days after receiving deposit.

Warranty:  Two years, and we will provide technical support for wholelife of the equipment. If some parts of machine broken within 2 years, we will give customer the spare parts for free. (include chain, bearing, roller, oil pipe, counting wheel) If more than 2 years, maybe some spare parts need to be charged. If machine can not work well, we can teach them online until the machine is perfect. If you need, we can go to your place to assist you. But you need to provide the cost of the engineer.

FAQ

Q1. What’s your payment terms and delivery time?
A1: 30% as the deposit by T/T in advance, 70% as the balance payment by T/T after your inspect the machine well and before delivery. Of course your payment terms are acceptable.

After we get down payment, we will arrange production. About 30-45 days for delivery.

Q2. Do you have after-sales support?
A2: Yes, we are happy to provide advice and we also have skilled technicians available across the world.

Q3. Do you sell only standard machines?
A3: No, most of our machines are built according to customers specifications, using top brand components.
Q4. What will you do if the machine is broken?
A4: We provide 18 months free warranty and free technical support for the whole life of any machine.
If the broken parts can’t repair, we can send the new parts replace the broken parts freely, but you need pay the express cost by yourself. If it is beyond the warranty period, we can negotiate to solve the problem, and we supply the technical support for the whole life of the equipment.

Q5. Can you be responsible for transport?
A5: Yes, please tell me the destination port or address. we have rich experience in transporting.

Q6. How to visit your company?
A6: 1) Fly to Beijing airport, By high speed train From Beijing Nan to Cangzhou Xi (1 hour).
2) Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.

Related Products

02
Metal stud and track roll forming machine C64
Please contact us for more details.
正面
Metal stud and track roll forming machine C75
Please contact us for more details.
正面
Metal stud and track roll forming machine C89
Please contact us for more details.
4 (2)
Metal stud and track roll forming machine Z type
Please contact us for more details.

Send us a message